Village board weighs impact of garage fire; discusses sidewalk work

MILLERTON — On Monday, Feb. 10, a board meeting was held, largely centered on the impact of the Feb. 3 fire that destroyed the Village Water and Highway building located on Route 22. In addition to the loss of the building, vehicles, equipment and tools were also destroyed.

“If we go back to the cause, it is still undetermined,” said mayor Jenn Najdek, who stated foul play had been ruled out. She also confirmed the garage remained off-limits as the investigation is still ongoing.

Alongside the Mayor, village trustees expressed their concern regarding rumors as to the cause of the fire. According to trustee David Sherman, transparency with the public is key to distinguishing fact from fiction. “I think we should, through whatever releases we can make, make it abundantly clear what that status is so we can squelch these kinds of rumors that are oozing up in the community,” said Sherman.

The Village is working with Nordic Environment Finance Corporation, an independent cause and origin investigation company, to determine the cause of the blaze. According to Najdek, once the investigation is complete, investigators will greenlight the premises for entrance.Najdek also emphasized while investigators are working toward determining a cause, one may or may not be found, contingent on what the investigation yields.

According to Najdek, the Town of East Fishkill sent their engineer the morning of the fire to assist Village’s water operators in setting up a system to ensure drinking water would continue to flow. The village’s supply of drinking water has been continuously evaluated by the New York State Department of Environmental Conservation as well as the Board of health to ensure fitness for human consumption.

With one of the wells being destroyed in the fire, the Village’s water will be conditioned as required and pumped from well no. 1, known as the “doghouse,” to a holding tank as a temporary solution.

“Well no. 2 that was in the building, we can selectively demo around it, secure it, get a semi permanent structure,” Najdek said. “We don’t know what that’s going to be. There’s one hundred different solutions for that, and we will know more after this week.”

The Village trustees showed interest in an acting structure which resembles a “plug and play” system, where all water operating equipment will be housed. “We will be meeting with the engineer, the water operator and Pete [Dellaghelfa, Village’s Superintendent of Public Works], this week on-site and we will start looking for the immediate, short-term solution,” said Najdek.

Previously, the Millerton Water Department housed two 10-inch diameter wells in an unconsolidated aquifer that allowed filtration through 50 feet of sand and gravel. The water then gets pumped into an elevated holding tank, where it is treated and chlorinated before being distributed to residents.

Currently, well no. 1 is being operated by a generator while the power lines to the building are in the midst of being fixed. The intent of these lines, according to Najdek, is to potentially serve electricity to both of the wells and the baseball field lighting.

With the loss of vehicles and equipment, the village is hoping to be indemnified once insurance claims are settled. “We’ve incurred a lot of expenses so far,” Najdek said, explaining her confidence in village insurer New York Municipal Insurance Reciprocal. “I feel pretty good about them being able to handle our needs in a timely manner.”

The Village will have a three-month window to borrow vehicles or equipment as needed from the town, county or the state. “God forbid the county’s truck hits the bed, we can ask the state ‘Do you have any trucks that you could loan us?’” Najdek said.

The mayor requested the Highway and Police department compile a wish list of vehicles and equipment for immediate needs. The village hopes to avoid buying used trucks and equipment, hopefully avoiding any problems that come with them, said public works superintendent Dellaghelfa. “It’s not that I’m against used. I just want to see that the village is getting their money’s worth.”

Once Najdek has confirmation from the insurance company, the village will start moving forward with the “wish-lists” from both the Highway and Police Departments. At this time, patience is what’s needed most, explained Najdek. “For those who have never been through a fire, this is a marathon. It’s not a sprint,” she said. “Sometimes answers don’t come into the third mile or fourth mile. It’s not something where information comes quickly from insurance companies everyday, so there will potentially be no updates.”

The village’s state of emergency declaration, which went into effect the morning of the fire, remains in place.

During the meeting, trustee Sherman provided updates on where the village stands for the Community Development Block Grant. The village is planning to use this grant to replace a few sections of sidewalks which need improvement.

“Some things are going to require some engineering input to see how we can rebuild this area,” Sherman said. “The aim is to put some estimates together and have the board’s consideration for our next meeting to approve making a CDBG application for this 2025 year and keeping it with a total cost under the $200,000 level, which is the max.”

According to Sherman, the focus will be on the sidewalks near John Street, also known as Smith Court and North Center Street. The Village needs to submit its request for the grant by Monday, March 3, to be considered.

Latest News

County legislature candidates lay out their priorities

Contested seats in the Dutchess County Legislature are close to home this election season, with Districts 19 and 25 covering the rural towns across the northern and eastern corners of the county. Though the candidates bring distinct experiences and perspectives, they share common ground on some of the biggest challenges facing local communities, including emergency medical services and affordable housing.

Here’s a look at the candidates.

Keep ReadingShow less
Classifieds - October 23, 2025

Help Wanted

Weatogue Stables has an opening: for a full time team member. Experienced and reliable please! Must be available weekends. Housing a possibility for the right candidate. Contact Bobbi at 860-307-8531.

Services Offered

Hector Pacay Service: House Remodeling, Landscaping, Lawn mowing, Garden mulch, Painting, Gutters, Pruning, Stump Grinding, Chipping, Tree work, Brush removal, Fence, Patio, Carpenter/decks, Masonry. Spring and Fall Cleanup. Commercial & Residential. Fully insured. 845-636-3212.

Keep ReadingShow less
Vincent Inconiglios brings ‘Face Time’ to Hunt Library
Artist Vincent Inconiglio’s show “Face Time” opens Oct. 25 at the Hunt Library.
L. Tomaino

Abstract artist Vincent Inconiglios' love and enthusiasm for color and form are evident all around him at his Falls Village studio, where he has worked for 25 years. He is surrounded by paintings large and small, woodcuts, photographs, collages and arrays of found objects.

The objects Inconiglios has found while out walking — in Falls Village, near his studio on Gansevoort Street in New York City, and in other places throughout the world — hold special importance to him. Appreciation of them, he says, comes from “seeing while exploring. I am always finding things.” His particular delight is finding objects that look like faces, many of which will be featured in the ArtWall show at the Hunt Library.

Keep ReadingShow less
The Thyme in Sheffield blends nature, wellness and community

The central communal space, featuring an A for Ara audio system, gong and Tibetan bowls, hosts up to 80 guests for sound meditations and healing music experiences.

Provided

The Thyme, on Route 41 in Sheffield, is a retreat center offering a variety of residential and non-residential programs and services to the local community and Berkshire‑area visitors. A new incarnation of what for many years was the Option Institute, The Thyme is the dream project of James Davies and Andrew Murray, business partners who left the pressures of international banking and moved with their families to this Berkshires campus in September 2024. They bought the 85‑acre property from Barry and Susan Kaufman for $5.35 million and, together with five other business partners, have been renovating the property’s many buildings ever since.

The center opened in January of this year and is a work in progress as the team continues to refine its offerings. Since opening, the venue has hosted events across 22 weekends, with most bookings for residential retreats with some spiritual element. Upcoming events include a women’s retreat (The Wild Rest), a family Halloween event called Curiouser, and a Thanksgiving weekend for those who have already visited the property. The year will culminate with a weekend retreat around the winter solstice facilitated by renowned astrologer Rebecca Gordon.

Keep ReadingShow less