North East Fire District focuses on budget, spending

The North East Fire house on the south side of Century Boulevard.
Photo by Krista A. Briggs

The North East Fire house on the south side of Century Boulevard.
MILLERTON — The commissioners of the North East Fire District recently held their monthly meeting at the firehouse to discuss their current needs and general business.
Discussion centered around the current work on the 2025 budget and proposed expenditures, which ranged from upgrading their heating/cooling system to the possibility of replacing car no. 3.
The possibility of obtaining a new vehicle, such as a pickup truck, was also considered. In the end, the discussion was put on hold with chair Dave McGhee saying, “We have time.”
Updates on planning and training were discussed. Fire chief Keith Roger reported that 15 calls for medical assistance came in for the previous month, two calls came in for motor vehicle accidents, one call for a fire and one call came in for a propane issue which was quickly resolved. There were 35 calls for downed wires.
Physicals were also a topic of conversation. The fire district currently has 47 members, some of whom still need physicals. The district’s plan is that all members will be caught up on physicals by autumn.
The Easter egg hunt to be held on April 19 was discussed in addition to the need to look into hay wagons for the event.
As part of the chief’s report, Roger discussed equipment. Hose-testing is scheduled to be conducted on April 9. He also stressed the need to order brush equipment and side mirrors. Roger stated he needs to figure out exactly what is needed to fill department needs, but “bib overalls, radios and wands,” are on his wish list as well as new labels for equipment.
The discussion then turned to two events. On March 27, assistant county executive Gregg Pulver will be holding a closed meeting to discuss EMS issues. On April 18, Kelly Roger will be utilizing the firehouse for an event. Building use was approved for both events.
The subject of air packs then came up as one had sustained damage. Chief Roger also reported he is looking into which responders are in need of new equipment. Additionally, he has been trying to meet with new vendors. He has also started a log book for recordkeeping purposes around equipment to enable the department to track its movement and usage throughout the department.
Responder Chris Reyes discussed his work on the annual dinner and requested that $15,000 be made available for associated expenses. A motion was made to allow, which was officially passed.
No new members have recently joined the fire department, but recruitment efforts remain ongoing with interested parties being encouraged to come to the fire district on Monday evenings at 6 p.m. to learn more.
The next meeting at the firehouse will be a workshop on April 1. A regular meeting will be held on April 15.
A water main under Indian Lake Road in Amenia sprays water after construction workers with C. Gallagher Contracting, of Brewster, New York, attempted to cut the pipe to replace a damaged section on Tuesday, Jan. 27. Crew members said high pressure in a pipe encumbers cutting, fills the hole with too much water, and could cause workers to be too wet for the extremely low temperatures.
AMENIA — Amenia's water system struggled under the stress of frigid temperatures on Tuesday, Jan. 27, as two leaks sprung from water mains in different parts of town.
An emergency break under Indian Lake Road required a section of pipe be removed and completely replaced. C. Gallagher Contracting of Brewster, New York, provided excavation and pipe repair services for both breaks.
The pipe was fixed by 9:30 p.m. and water service was restored to affected customers, crew members said.
Flow from the pipe had not slowed at 8:30 p.m. even after shutting one of the valves, crew members on site said. Representatives of VRI Environmental Services — Amenia's contracted water system operator — located other valves and fire hydrants to further reduce pressure in the pipe shortly before 9 p.m.

Pat Cusano, of North Salem, New York, assisted the Gallagher crew on Tuesday for two water main breaks in Amenia. The first sprung up on Depot Hill Road and was reported by resident David Intrieri at 8:45 a.m.
The Depot Hill Road leak was patched with a collar seal that wrapped around the leak. The crew put the collar in place around 2:30 p.m.
Cusano said the crew went immediately to the Indian Lake Road leak after that, but the first valve couldn't be located until roughly 7:30 p.m.

Imprecisely marked valves on a map of the town's water system caused significant delays in repairing the Indian Lake Road leak, crew members said. Water Committee Chair Bill Flood said VRI only recently took over managing Amenia's water system, and company representatives were still becoming familiar with the district's layout.
Cusano said locating the valves was further complicated by large snowbanks hiding the infrastructure.
VRI representatives said there is a break in Millerton as well, but the leak did not require immediate attention. Crews are expected to patch that leak tomorrow.

The breaks were caused by the extreme cold weather, crew members said. Cold temperatures can cause dirt to shift and contract, putting stress on pipes that are up to 30 years old in Amenia.
"There'll be more tomorrow, and the next day, and the next day," Cusano said. "It's just that time of year."
Snow covered Route 44/22 near the Maplebrook School campus in Amenia at 10:30 a.m. Sunday, Jan. 25.
Dutchess County officials issued a travel ban on all public roads from 5 a.m. Sunday, Jan. 25, to 5 p.m. Monday, Jan. 26.
The National Weather Service issued a Winter Storm Warning for much of upstate New York on Friday. Forecasts call for between 10 and 20 inches of snow across northeast Dutchess County.
Road crews across the region told The News that they are feeling prepared.
Visits to North East, Amenia, Washington, Stanford and Pine Plains revealed the salt is in good supply and the equipment is in good working order ahead of the storm.
Stanford Highway Superintendent Jim Myers and his crew were strapping plows to a truck in the town garage on Friday morning, Jan. 23. He said the Stanford road crew was as prepared as it can be, echoing a common sentiment among crews in the region.
"You just got to stay on top of it," Myers said. "Keep going."
County Executive Sue Serino said in a post on FaceBook that all non-emergency and non-essential travel is forbidden until 5 p.m. Monday. Only emergency personnel, road crew members, employees deemed essential for facility operation and news media covering the storm are permitted to travel during the ban.
All others are required to stay home. Pine Plains Highway Superintendent Carl Baden said that's the safest course of action during the storm.
"Just stay home," he said. "We can make it a lot safer for you if you wait."
Members of the North East Town Board discuss proposed zoning code revisions during a meeting at North East Town Hall in Millerton on Monday, Jan. 19.
MILLERTON — The North East Town Board on Monday, Jan. 19, adopted a series of detailed revisions to its proposed zoning code overhaul, incorporating feedback from county and local agencies as well as public comments.
Zoning Review Commission Chair Edie Greenwood and the town’s zoning consultant, Will Agresta, participated in the meeting as board members reviewed comments submitted by Dutchess County Planning, the North East Planning Board, the town’s Conservation Advisory Council, and residents who spoke or submitted written remarks during the initial public hearing on Jan. 8.
Board members addressed the comments line by line, approving changes that Greenwood described as largely technical in nature, including revisions to definitions that did not align with state regulations and clarifications intended to improve readability and consistency.
Greenwood said a red-line draft showing the approved changes alongside the original text will be prepared.
Among the more substantive revisions was the decision to impose an overall size cap on accessory dwelling units. The board voted to limit ADUs to a maximum of 1,200 square feet and specified that they must be accessed from an existing driveway on the property. Board members also discussed adding language to clarify how ownership through an LLC or trust would comply with the requirement that the property owner reside in the principal dwelling.
The board also approved allowing retail businesses and restaurants in the so-called Irondale District, a small commercial area encompassing seven parcels along Route 22 near Winchell Mountain Road and Irondale Road.
Other changes included:
– Replacing the term “farm” with “farm operation” for consistency with state law.
— Revising drive-through regulations to allow additional lanes for banks.
— Tying requirements for landscaped islands in parking lots to the size of the lot.
— Adding expiration dates for site plan approvals.
— Removing references to “cage-type poultry farms.”
— Requiring 10% of parking spaces in lots with 30 or more spaces to be “EV-ready,” meaning the necessary infrastructure must be installed, but not necessarily a charger itself.
— Standardizing safety and maintenance requirements across all parking regulations.
— Clarifying that parking structures may be built above or below grade.
— Allowing farm machinery sales and rentals.
Greenwood told The News she expects the red-line draft to be completed and submitted before the end of next week. The Town Board is set to continue the public hearing on the proposed zoning changes on Tuesday, Feb. 3, at 7 p.m. at North East Town Hall.